Pont de la Verrerie in Fillière closed for repairs

The bridge will be inaccessible at night and during specific periods between September 26 and October 30, 2026.

Road closure sign for work on the Pont de la Verrerie in Fillière.
AI

Road closure sign for work on the Pont de la Verrerie in Fillière.

The Pont de la Verrerie, located in Fillière, will be closed to traffic for renovation work from Saturday, September 26 to Friday, October 30, 2026.

The municipality of Fillière announces the closure of the Pont de la Verrerie, located on Chemin de l’Adiau, due to renovation work. These disruptions will begin on Saturday, September 26, 2026, and will extend until Friday, October 30, 2026.
During this period, the bridge will be closed to traffic between 6 PM and 7 AM. During these hours, access will still be possible for local residents with vehicles under 3.5 tonnes, as well as for emergency and service vehicles, also under the weight limit.
A complete closure of the bridge is also planned. It will begin on Thursday, October 1, 2026, at 7 AM and will end on Monday, October 12, 2026, at 6 PM. No diversions are in place during these periods.
Based on information from the official source: Mairie de Fillière (24/09/2026)