New regulation on hedge removal in metropolitan France

Since October 1, 2026, a declaration is mandatory for hedge removal, with a compensation requirement.

Close-up of a dense, green hedge, showing the texture of the leaves and twigs.
AI

Close-up of a dense, green hedge, showing the texture of the leaves and twigs.

Since October 1, 2026, new regulations impose specific procedures for hedge removal in metropolitan France, strengthening the protection of these essential elements for biodiversity and landscapes.

Hedges play a crucial role in soil preservation, runoff limitation, biodiversity promotion, and the creation of cool spaces. Aware of their importance, metropolitan France has implemented, since October 1, 2026, a new regulatory framework to govern their destruction.
From now on, any project involving the destruction or removal of a hedge covered by this regulation must be declared through a single national portal. It is strongly recommended to verify the applicable rules for one's project and to contact the Urban Planning Department of the City of Oyonnax at 04 74 81 27 27 before undertaking any work.
This new system also introduces a reinforced compensation principle. When a hedge is destroyed, its replanting becomes mandatory from the first meter removed, with a replacement length at least equivalent to that which was destroyed.
It is important to note that the Local Urban Plan (PLU) may identify certain hedges or landscape elements as requiring specific protection. Therefore, it is essential to consult the local urban planning rules before any project. The new regulation centralizes administrative procedures but does not eliminate existing protections, whether related to urban planning, protected species, water, or heritage.
Before any intervention on a hedge, it is advisable to follow several steps: check the PLU rules applicable to the land, contact the Urban Planning department, complete the necessary declaration before starting work, inquire about the authorized periods for removal, and anticipate the compensatory replanting that may be requested.
In summary, since October 1, 2026, it is imperative to be informed about the applicable rules before proceeding with hedge removal.
Based on information from the official source: Ville d'Oyonnax (06/10/2026)